If the customer installed the charcoal machine to pay attention to the key points
In general, customers purchase a charcoal machine, the manufacturer will assign technicians to install and debug, and train the staff until the qualified carbon location is produced. But there may also be special situations where customers need to install their own devices. So what points should be paid attention to in the actual installation?
Whether all connection screws tighten, especially the three top wire heating pipes, open the cooling water pipe and connect the appliances and wires. Check all lubricated parts. Check whether the power supply voltage is normal. The device runs for 3 minutes without a card, touch, and other abnormality that can be put into normal production. When the exception is detected when debugging, it is necessary to stop looking for the cause immediately, and the troubleshooting will be carried out. Adjust the thermostat to the desired temperature. When the temperature reaches the desired temperature, start and add the appropriate amount of raw material. Then gradually increase, until the production of qualified products, if the normal production 30 minutes, indicates that the commissioning is successful, run normal production. At the same time the fuselage must be well grounded.